How much time is saved in PEB over conventional buildings?metbuildinfra2023-05-11T05:50:39+00:00Pre engineered buildings are pre-fabricated in the factories, and are then assembled at the site in a modular fashion, which helps reduce the construction time by 40%, on an average. Additionally, use of automated technology Guarantees quality adherance and accuracy, thus aiding the overall reduction in the turn around time of the project.